Donate
Fundraising Campaign · October–December 2026

Rise to Help the Rink

Same Rink. Brighter Future.

Nearly $600,000 raisedGoal: $3,000,000
Set aside by the committee from annual fundraising efforts and donations.
Donate Now See the Plans

Rendering of the proposed renovated Luseland Memorial Arena.

More than a rink. It’s home.

Why This Matters

Our arena serves minor and senior hockey, recreational skating, school activities, learn-to-skate programs, tournaments, and community events. In our rural community, it provides children and families with opportunities to be active, build friendships, develop leadership and teamwork, and stay connected to our community. Regional events also support the local business community through the usage of food, accommodations, fuel and other service providers.

Increased Accessibility

The arena was built in 1947, when accessibility standards were very different. Our improvements will remove barriers so players, coaches, officials, volunteers, families, and spectators of all ages and abilities can participate with greater independence, dignity, and confidence. New changerooms and washrooms will meet accessibility standards that our current arena doesn’t meet. The new entrance area will include accessible doors to ensure everyone can access our facilities.

Phase 3: Bringing the Vision to Life

The decommissioned curling rink, as it stands, has severe structural issues that need to be addressed. If not addressed soon, these issues will begin to compromise the concession and washroom area, which are critical areas to the continued operation of the skating rink as a whole. We have developed plans to replace the curling rink, concession and washroom area with a newly constructed space and renovate our existing entrance area. This will give us 4 new dressing rooms, storage space, a referee room, a warm and comfortable spectator area, wheelchair-accessible washrooms, improvements to the waiting room area, an all-new concession area with up-to-date equipment, as well as give the exterior and façade of the building a much-needed update.

This next phase is the most ambitious and one of the most important. The overall project cost is estimated at approximately $3 million.

What the $3 Million Goal Will Deliver

The proposed renovation and 6,600 sq. ft. addition modernizes the existing facility, addresses structural concerns and brings key areas closer to current accessibility, building and fire-code expectations.

Demolition & Site Preparation

Remove the unused curling rink structure, kitchen and basement structure; reroute services; prepare the area for new construction.

New Addition

Modern dressing rooms, washrooms, kitchen, storage areas, mechanical space and supporting circulation.

Improved Entrance

Double doors to improve insulation and energy efficiency, a heated viewing area, additional office space, and an improved waiting area.

Accessibility

An accessible vestibule/entrance and wheelchair-accessible washrooms, reducing barriers for spectators and participants.

Fire Safety

New fire suppression and fire alarm systems throughout the building.

Mechanical & Electrical

New/altered plumbing, water and sewer services, boiler system, kitchen make-up air, ventilation, electrical, lighting and controls.

Durable Finishes

Skate flooring, epoxy flooring, abuse-resistant wall systems, FRP, tile and other finishes suited to a busy arena.

Exterior Renewal

New cladding on the addition and east wall, architectural treatment at the main entry and a more welcoming public face.

Stretch Goal: If fundraising exceeds the amount required for the main renovation, the committee would like to direct additional funds toward further improvements to the Zamboni room.

Accomplishments to Date

This project builds on several years of community investment, planning and completed improvements.

Phase 1 · Completed in 2023

  • Expanded players’ boxes
  • Expanded and relocated penalty boxes
  • Installed a new sound system

Phase 2 · Completed in 2024/2025

  • Completed engineered structural and foundation work
  • Joint sponsorship toward a new Zamboni
  • Completed header trench maintenance and repairs
  • Refurbished the exterior of the Zamboni room and resolved drainage issues
  • Improved ice access and storage for half ice boards and equipment
  • Installed additional speakers to further improve the fan experience
Volunteers planning the players' box expansion
Players’ box expansion
Relocated penalty boxes
Penalty box relocation
New arena sound system
New sound system
Glass installation
Glass installation
West wall structural repair
West wall structural repair
New Zamboni and 2024 sponsors
New Zamboni (2024) – 1 of 4 major sponsors
Header trench dig
Header trench repairs
Refurbished Zamboni room exterior
Zamboni room exterior
Drainage work
Drainage improvements

Phase 3 Timeline

  1. October–November 2026Major fundraising drive
  2. December 2026Decision whether enough funding has been secured to proceed
  3. March 2027Target: break ground and begin project
  4. Late Fall 2027Target: grand opening of the renovated arena

Donor Recognition

LevelDonation
Diamond$250,000+
Platinum$100,000–$249,999
Gold$50,000–$99,999
Silver$25,000–$49,999
Bronze$10,000–$24,999
Builder$5,000–$9,999
Supporter$1,000–$4,999
Friends of the ArenaUp to $999

Donors will be recognized on a donor wall. Unless otherwise requested, all donations will be publicly recognized as part of our fundraising campaign. Donors who prefer to remain anonymous may opt out by indicating their preference at the time of their donation.

Naming Opportunities

LocationInvestment
Arena Naming Rights$1,000,000
Kitchen & Lobby Area$400,000
Public Washrooms$200,000
Dressing Room #1$100,000
Dressing Room #2$100,000
Dressing Room #3$100,000
Dressing Room #4$100,000

Naming rights agreements are established for a 25-year term, unless an alternative term is mutually agreed upon and specified in writing. Additional naming and legacy opportunities may become available as the design is finalized. Major partners are encouraged to speak with the fundraising committee about customized recognition.

Project Contacts

Candice KraftCommittee Chair
306-372-7736
Dallas CairnsFundraising Lead
306-834-4017
Adam FrankoDesign Lead
306-220-2901
Caley OstrowskiSecretary
Brian GottfriedCommittee Member
Kelsy ThompsonCommittee Member
Brent HonekerCommittee Member